2026-01-05 10:49:13 -05:00
|
|
|
|
---
|
|
|
|
|
|
title: "Standard Operating Procedure for Handling Broken EEG Nets"
|
|
|
|
|
|
author: ""
|
|
|
|
|
|
date: 2026-01-05
|
|
|
|
|
|
version: "1.0"
|
|
|
|
|
|
status: "Draft"
|
|
|
|
|
|
---
|
|
|
|
|
|
## 1. Purpose
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Define standardized procedures for identifying, handling, documenting, repairing, or disposing of broken EEG nets.
|
|
|
|
|
|
- Ensure compliance with FDA 21 CFR Part 11, ISO 9001, and ISO 13485 requirements.
|
|
|
|
|
|
- Minimize risk to subjects, staff, and data integrity.
|
|
|
|
|
|
|
|
|
|
|
|
## 2. Scope
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Applies to all EEG nets used in clinical, research, or manufacturing environments within the organization.
|
|
|
|
|
|
- Covers detection of damage, removal from service, evaluation, repair, disposal, and documentation.
|
|
|
|
|
|
|
|
|
|
|
|
## 3. Definitions
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- **EEG Net**: A multi-electrode sensor array used for electroencephalography data collection.
|
|
|
|
|
|
- **Broken EEG Net**: Any EEG net exhibiting physical damage, electrical malfunction, missing components, or performance deviation.
|
|
|
|
|
|
- **Nonconformance**: Failure to meet specified requirements.
|
|
|
|
|
|
|
|
|
|
|
|
## 4. Regulatory and Quality References
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- FDA 21 CFR Part 11 – Electronic Records; Electronic Signatures
|
|
|
|
|
|
- ISO 9001 – Quality Management Systems
|
|
|
|
|
|
- ISO 13485 – Medical Devices Quality Management Systems
|
|
|
|
|
|
- Internal Quality Manual ""
|
|
|
|
|
|
- Risk Management Procedure ""
|
|
|
|
|
|
|
|
|
|
|
|
## 5. Responsibilities
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- **EEG Technician**
|
|
|
|
|
|
- Identify and report broken EEG nets.
|
|
|
|
|
|
- Remove affected nets from service immediately.
|
|
|
|
|
|
- **Quality Assurance (QA)**
|
|
|
|
|
|
- Review documentation and assess compliance.
|
|
|
|
|
|
- Approve repair or disposal decisions.
|
|
|
|
|
|
- **Engineering / Maintenance**
|
|
|
|
|
|
- Evaluate damage and perform authorized repairs.
|
|
|
|
|
|
- **Document Control**
|
|
|
|
|
|
- Maintain records in accordance with Part 11 requirements.
|
|
|
|
|
|
|
|
|
|
|
|
## 6. Required Materials and Records
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Nonconformance Report (NCR) Form ""
|
|
|
|
|
|
- Equipment Log ""
|
|
|
|
|
|
- Repair and Maintenance Record ""
|
|
|
|
|
|
- Labeling materials for status identification
|
|
|
|
|
|
|
|
|
|
|
|
## 7. Procedure
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
### 7.1 Identification of Broken EEG Nets
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Inspect EEG nets before and after each use.
|
|
|
|
|
|
- Indicators of breakage include:
|
|
|
|
|
|
- Visible tears or frayed wiring
|
|
|
|
|
|
- Missing or damaged electrodes
|
|
|
|
|
|
- Signal noise or failure during testing
|
|
|
|
|
|
- *Document findings immediately upon detection.*
|
|
|
|
|
|
|
|
|
|
|
|
### 7.2 Removal from Service
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Tag the EEG net as "Out of Service".
|
|
|
|
|
|
- Remove from clinical or research area.
|
|
|
|
|
|
- Update the Equipment Log with date and reason.
|
|
|
|
|
|
|
|
|
|
|
|
### 7.3 Documentation
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Complete a Nonconformance Report with:
|
|
|
|
|
|
- Net identification number ""
|
|
|
|
|
|
- Description of damage ""
|
|
|
|
|
|
- Date identified ""
|
|
|
|
|
|
- Reporter name ""
|
|
|
|
|
|
- Ensure electronic records comply with 21 CFR Part 11 controls.
|
|
|
|
|
|
|
|
|
|
|
|
### 7.4 Evaluation and Disposition
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- QA and Engineering assess:
|
|
|
|
|
|
- Severity of damage
|
|
|
|
|
|
- Impact on data integrity and safety
|
|
|
|
|
|
- Determine disposition:
|
|
|
|
|
|
- Repair
|
|
|
|
|
|
- Return to vendor
|
|
|
|
|
|
- Disposal
|
|
|
|
|
|
- *Record justification for the decision.*
|
|
|
|
|
|
|
|
|
|
|
|
### 7.5 Repair Process
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Perform repairs only by trained and authorized personnel.
|
|
|
|
|
|
- Verify functionality post-repair using approved testing methods.
|
|
|
|
|
|
- Document all repair activities and results.
|
|
|
|
|
|
|
|
|
|
|
|
### 7.6 Disposal
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Dispose of irreparable EEG nets according to waste management and environmental procedures.
|
|
|
|
|
|
- Remove asset from inventory records.
|
|
|
|
|
|
|
|
|
|
|
|
### 7.7 Return to Service
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- QA approval required prior to reuse.
|
|
|
|
|
|
- Update status label to "Approved for Use".
|
|
|
|
|
|
- Archive all related records.
|
|
|
|
|
|
|
|
|
|
|
|
## 8. Training Requirements
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Personnel must be trained on this SOP prior to handling EEG nets.
|
|
|
|
|
|
- Training records shall be maintained and reviewed periodically.
|
|
|
|
|
|
|
|
|
|
|
|
## 9. Risk Management
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Identify risks associated with use of damaged EEG nets.
|
|
|
|
|
|
- Implement controls to prevent recurrence.
|
|
|
|
|
|
- Link nonconformance data to corrective and preventive action processes.
|
|
|
|
|
|
|
|
|
|
|
|
## 10. Deviations and Corrective Actions
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Document any deviations from this SOP.
|
|
|
|
|
|
- Initiate CAPA when trends or repeated failures are identified.
|
|
|
|
|
|
|
|
|
|
|
|
## 11. Records Retention
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Retain records according to Records Retention Policy "".
|
|
|
|
|
|
- Ensure secure storage and controlled access.
|
|
|
|
|
|
|
|
|
|
|
|
## 12. Change Management
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
2026-01-05 10:49:13 -05:00
|
|
|
|
- Changes to this SOP require review and approval per Document Control procedures.
|
|
|
|
|
|
- Maintain revision history.
|
|
|
|
|
|
|
|
|
|
|
|
## 13. Version Control
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
|
|
|
|
|
VersionDateDescription of ChangeAuthor1.02026-01-05Initial draft""
|
2026-01-05 10:49:13 -05:00
|
|
|
|
|
|
|
|
|
|
## 14. Approval Signatures
|
2026-01-05 10:49:33 -05:00
|
|
|
|
|
|
|
|
|
|
NameTitleSignatureDate""""""""""""""""""""""""
|