Files
getting-started/Reports/SOP-LAB-001-Broken-EEG-Net-Handling.md

139 lines
4.1 KiB
Markdown

---
title: "Standard Operating Procedure for Handling Broken EEG Nets"
author: ""
date: 2026-01-05
version: "1.0"
status: "Draft"
---
## 1. Purpose
- Define standardized procedures for identifying, handling, documenting, repairing, or disposing of broken EEG nets.
- Ensure compliance with FDA 21 CFR Part 11, ISO 9001, and ISO 13485 requirements.
- Minimize risk to subjects, staff, and data integrity.
## 2. Scope
- Applies to all EEG nets used in clinical, research, or manufacturing environments within the organization.
- Covers detection of damage, removal from service, evaluation, repair, disposal, and documentation.
## 3. Definitions
- **EEG Net**: A multi-electrode sensor array used for electroencephalography data collection.
- **Broken EEG Net**: Any EEG net exhibiting physical damage, electrical malfunction, missing components, or performance deviation.
- **Nonconformance**: Failure to meet specified requirements.
## 4. Regulatory and Quality References
- FDA 21 CFR Part 11 Electronic Records; Electronic Signatures
- ISO 9001 Quality Management Systems
- ISO 13485 Medical Devices Quality Management Systems
- Internal Quality Manual ""
- Risk Management Procedure ""
## 5. Responsibilities
- **EEG Technician**
- Identify and report broken EEG nets.
- Remove affected nets from service immediately.
- **Quality Assurance (QA)**
- Review documentation and assess compliance.
- Approve repair or disposal decisions.
- **Engineering / Maintenance**
- Evaluate damage and perform authorized repairs.
- **Document Control**
- Maintain records in accordance with Part 11 requirements.
## 6. Required Materials and Records
- Nonconformance Report (NCR) Form ""
- Equipment Log ""
- Repair and Maintenance Record ""
- Labeling materials for status identification
## 7. Procedure
### 7.1 Identification of Broken EEG Nets
- Inspect EEG nets before and after each use.
- Indicators of breakage include:
- Visible tears or frayed wiring
- Missing or damaged electrodes
- Signal noise or failure during testing
- *Document findings immediately upon detection.*
### 7.2 Removal from Service
- Tag the EEG net as "Out of Service".
- Remove from clinical or research area.
- Update the Equipment Log with date and reason.
### 7.3 Documentation
- Complete a Nonconformance Report with:
- Net identification number ""
- Description of damage ""
- Date identified ""
- Reporter name ""
- Ensure electronic records comply with 21 CFR Part 11 controls.
### 7.4 Evaluation and Disposition
- QA and Engineering assess:
- Severity of damage
- Impact on data integrity and safety
- Determine disposition:
- Repair
- Return to vendor
- Disposal
- *Record justification for the decision.*
### 7.5 Repair Process
- Perform repairs only by trained and authorized personnel.
- Verify functionality post-repair using approved testing methods.
- Document all repair activities and results.
### 7.6 Disposal
- Dispose of irreparable EEG nets according to waste management and environmental procedures.
- Remove asset from inventory records.
### 7.7 Return to Service
- QA approval required prior to reuse.
- Update status label to "Approved for Use".
- Archive all related records.
## 8. Training Requirements
- Personnel must be trained on this SOP prior to handling EEG nets.
- Training records shall be maintained and reviewed periodically.
## 9. Risk Management
- Identify risks associated with use of damaged EEG nets.
- Implement controls to prevent recurrence.
- Link nonconformance data to corrective and preventive action processes.
## 10. Deviations and Corrective Actions
- Document any deviations from this SOP.
- Initiate CAPA when trends or repeated failures are identified.
## 11. Records Retention
- Retain records according to Records Retention Policy "".
- Ensure secure storage and controlled access.
## 12. Change Management
- Changes to this SOP require review and approval per Document Control procedures.
- Maintain revision history.
## 13. Version Control
VersionDateDescription of ChangeAuthor1.02026-01-05Initial draft""
## 14. Approval Signatures
NameTitleSignatureDate""""""""""""""""""""""""